From:

12155 Magnolia Avenue Unit 10-E,
Riverside, CA 92503

Phone: (951) 279-7705
Email: ema@imccleanup.com
CSLB Lic # 962294

Quote Number 0792
Quote Date September 20, 2019
Valid Until March 18, 2020
Total $4,916.00
To:
CMD Construction

9272 Jeronimo Road, Suite 102,
Irvine, CA 92618

22800 Savi Ranch Pkwy Ste 206 Yorba Linda CA

We hereby propose to furnish all equipment and materials, and perform the labor necessary for the completion of the following work
During work hours

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Remove (7) 3080 doors and frames and haul
$700.000.00%$700.00
1 Remove and scrape all carpet and base cove throughout suite
$726.000.00%$726.00
1 Remove approx. 111 LF of drywall and steel studs
$1,776.000.00%$1,776.00
1 Salvage instahot and water filter underneath sink
$50.000.00%$50.00
1 Cut out 4070 sidelight openings at (3) door locations. Approx. 12LF
$120.000.00%$120.00
1 Remove approx. 19 LF of upper and lower millwork in breakroom
$380.000.00%$380.00
1 Remove all stained, damaged, or aged ceiling tiles throughout suite. Approx. 30-40 tiles
$50.000.00%$50.00
1 Final clean up Includes vacuum, wipe down of doors, frames, and any internal sidelight glass. Does NOT include window washing
$664.000.00%$664.00
1 Haul away all debris off site $450.000.00%$450.00
Sub Total $4,916.00
Tax $0.00
Total $4,916.00

Add a comment

Your email address will not be published. Required fields are marked *