From:

12155 Magnolia Avenue Unit 10-E,
Riverside, CA 92503

Phone: (951) 279-7705
Email: ema@imccleanup.com
CSLB Lic # 962294

Quote Number 1087
Quote Date March 5, 2020
Valid Until September 1, 2020
Total $2,416.25
To:
CMD Construction

9272 Jeronimo Road, Suite 102,
Irvine, CA 92618

22971 Triton Way, #B Laguna Hills, CA

We hereby propose to furnish all equipment and materials, and perform the labor necessary for the completion of the following work

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Remove and scrape approx. 548 SQFT of existing VCT
$548.000.00%$548.00
1 Demo approx. 212 LF of 4” base
$50.000.00%$50.00
1 Demo approx. 85 LF of base molding in warehouse
$25.000.00%$25.00
1 Demo (1) toilet and (1) wall mounted sink.
$100.000.00%$100.00
1 Remove (6) broken or damaged ceiling tiles
$60.000.00%$60.00
1 Final clean entire suite
$320.000.00%$320.00
1 Alternate #1: apply VCT wax for approx. 548 SQFT of VCT
$132.000.00%$132.00
1 Alternate #2: concrete polish approx.315 SQFT of warehouse. to 400 grit

Grind new concrete with a 30- or 40-grit metal-bonded diamond, Grind with an 80-grit metal-bonded diamond, Grind with a 150-grit metal-bonded diamond (or finer, if desired). Apply a chemical hardener to densify the concrete. Polish with a 100-grit or 200-grit resin-bond diamond, or a combination of the two. Polish with a 400-grit resin-bond diamond. Seal concrete and buff concrete floor

$1,181.250.00%$1,181.25
Sub Total $2,416.25
Tax $0.00
Total $2,416.25