From:

12155 Magnolia Avenue Unit 10-E,
Riverside, CA 92503

Phone: (951) 279-7705
Email: ema@imccleanup.com
CSLB Lic # 962294

Quote Number QUO-0031
Quote Date April 9, 2018
Valid Until October 6, 2018
Total $16,011.25
To:
Jaska Building Systems

14980 Hilton Drive Fontana, CA 92336

5400 E Olympic Blvd, Commerce, CA

We hereby propose to furnish all equipment and materials, and perform the labor necessary for the completion of the following work:

Hrs/Qty Service Rate/PriceAdjustSub Total
4043 Concrete Polish 4,043sf

Grind new concrete with a 30- or 40-grit metal-bonded diamond, Grind with an 80-grit metal-bonded diamond, Grind with a 150-grit metal-bonded diamond (or finer, if desired). Apply a chemical hardener to densify the concrete. Polish with a 100-grit or 200-grit resin-bond diamond, or a combination of the two. Polish with a 400-grit resin-bond diamond. Finish with a 800-grit resin-bond diamond.

$3.750.00%$15,161.25
1 Patch damage concrete floor area $850.000.00%$850.00
Sub Total $16,011.25
Tax $0.00
Total $16,011.25

Add a comment

Your email address will not be published. Required fields are marked *