From:

12155 Magnolia Avenue Unit 10-E,
Riverside, CA 92503

Phone: (951) 279-7705
Email: ema@imccleanup.com
CSLB Lic # 962294

Quote Number 1004
Quote Date January 23, 2020
Valid Until July 21, 2020
Total $74,434.50
To:
Caliber Construction

240 North Orange Avenue Brea, CA 92821

5572 Fresca Dr, Buena Park CA

We hereby propose to furnish all equipment and materials, and perform the labor necessary for the completion of the following work
During work hours/ We will need 5-6 weeks to complete job

Hrs/Qty Service Rate/PriceAdjustSub Total
18150 Polish concrete floor to 200 grit level based on 18,150sqft only during work hours

Grind new concrete with a 30- or 40-grit metal-bonded diamond, Grind with an 80-grit metal-bonded diamond, Grind with a 150-grit metal-bonded diamond (or finer, if desired). Apply a chemical hardener to densify the concrete. Polish with a 100-grit or 200-grit resin-bond diamond, or a combination of the two. Seal concrete and buff concrete floor

$3.750.00%$68,062.50
1 Remove thinset on 3,695sqft
$2,772.000.00%$2,772.00
1 Patch Spalled expansion joints 1 inc wide and up, based on 900 lf
$1,800.000.00%$1,800.00
1 Patch crack repair 1/4' wide and up on 1,200sqft $1,800.000.00%$1,800.00
Sub Total $74,434.50
Tax $0.00
Total $74,434.50

Add a comment

Your email address will not be published. Required fields are marked *