From:

12155 Magnolia Avenue Unit 10-E,
Riverside, CA 92503

Phone: (951) 279-7705
Email: ema@imccleanup.com
CSLB Lic # 962294

Quote Number 0438
Quote Date March 6, 2019
Valid Until September 2, 2019
Total $149,305.00
To:
CMD Construction

9272 Jeronimo Road, Suite 102,
Irvine, CA 92618

...Anthem Woodland Hills

We hereby propose to furnish all equipment and materials, and perform the labor necessary for the completion of the following work:

Hrs/Qty Service Rate/PriceAdjustSub Total
17900 Concrete polish to 800 grit on all 4 floors on approx 17,900sqft

Grind new concrete with a 30- or 40-grit metal-bonded diamond, Grind with an 80-grit metal-bonded diamond, Grind with a 150-grit metal-bonded diamond (or finer, if desired). Apply a chemical hardener to densify the concrete. Polish with a 100-grit or 200-grit resin-bond diamond, or a combination of the two. Polish with a 400-grit resin-bond diamond. Finish with a 800-grit resin-bond diamond. Seal concrete and buff concrete floor

$4.250.00%$76,075.00
1 Demo all walls including acoustical wall and remove fabric around bldg columns 5 on all 4 floors
$22,630.000.00%$22,630.00
1 Demo all vertical blinds and cabinets on all 4 floors
$12,150.000.00%$12,150.00
1 Demo all wood floors on all 4 floors
$22,500.000.00%$22,500.00
1 Demo all mirrors in Fitness room, all glass partitions and glass walls on all 4 floors
$10,350.000.00%$10,350.00
1 Haul away debris off site (dumpster rental included) $5,600.000.00%$5,600.00
Sub Total $149,305.00
Tax $0.00
Total $149,305.00

Add a comment

Your email address will not be published. Required fields are marked *