From:

12155 Magnolia Avenue Unit 10-E,
Riverside, CA 92503

Phone: (951) 279-7705
Email: ema@imccleanup.com
CSLB Lic # 962294

Quote Number 0622
Quote Date June 12, 2019
Valid Until December 9, 2019
Total $23,649.50
To:
VP-Build

Huntington Beach

We hereby propose to furnish all equipment and materials, and perform the labor necessary for
the completion of the following work:
Work is to be done during regular hours

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Concrete polish to level 3 (800 grit) on 3,363sqft

Grind new concrete with a 30- or 40-grit metal-bonded diamond, Grind with an 80-grit metal-bonded diamond, Grind with a 150-grit metal-bonded diamond (or finer, if desired). Apply a chemical hardener to densify the concrete. Polish with a 100-grit or 200-grit resin-bond diamond, or a combination of the two. Polish with a 400-grit resin-bond diamond. Finish with a 800-grit resin-bond diamond. Seal concrete and buff concrete floor

$14,683.500.00%$14,683.50
1 Prep floor to apply epoxy color chosen by costumer on 2,391sqft $8,966.000.00%$8,966.00
Sub Total $23,649.50
Tax $0.00
Total $23,649.50

Add a comment

Your email address will not be published. Required fields are marked *