From:

12155 Magnolia Avenue Unit 10-E,
Riverside, CA 92503

Phone: (951) 279-7705
Email: ema@imccleanup.com
CSLB Lic # 962294

Quote Number QUO-0029
Quote Date April 5, 2018
Valid Until October 2, 2018
Total $302,797.50
To:
Caliber Construction

240 North Orange Avenue Brea, CA 92821

Redlands

We hereby propose to furnish all equipment, materials, and perform the labor necessary for the completion of the following work:

Hrs/Qty Service Rate/PriceAdjustSub Total
451500 Machine scrub and rinse and 1 coat of acrylic sealer 451,500 SF
$0.070.00%$31,605.00
200 Epoxy coat Scrubber Dump (45 mil non skid color system 200
$8.000.00%$1,600.00
2000 Epoxy Coat White Sanitary Stripe with Three coat Primer/Epoxy/Uretahne System 2000LFx18”wide
$8.050.00%$16,100.00
600 Epoxy coat Battery Charging Area 600SF (15x40 area) Price for ¼

Any additional square footage to be charge at $4.25/sq.ft
For 1/8 price will be $3.75 per sqft= $2,250.00

$4.250.00%$2,550.00
1 Clean out and fill all slab control joints with Polyureathane material. Based on 53,700 LF Includes removal of existing MM80. ¼ “ x 1” joint fill
$132,480.000.00%$132,480.00
30000 Clean out and fill all slab forklift wire joints with Polyereathane material. Based on 30,000 LF ¼ x ½ joint fill. Includes removal of MM80 to ½ depth
$3.730.00%$111,900.00
3750 Misc epoxy patching- spalls from racks and old walls. Based on 3500 spalls, Cracks ¼ inch wider based on 250 LF

NOTE: We will need 8-9 weeks to complete job starting from 4/18.

$1.750.00%$6,562.50
Sub Total $302,797.50
Tax $0.00
Total $302,797.50